This project looked at designing a supply chain solution to improve the energy efficiency of the vast majority of the 26 million UK homes which will still be in use by 2050.It looked to identify ways in which the refurbishment and retrofitting of existing residential properties can be accelerated by industrialising the processes of design, supply and implementation, while stimulating demand from householders by exploiting additional opportunities that come with extensive building refurbishment.The project developed a top-to-bottom process, using a method of analysing the most cost-effective package of measures suitable for a particular property, through to how these will be installed with the minimum disruption to the householder. This includes identifying the skills required of the people on the ground as well as the optimum material distribution networks to supply them with exactly what is required and when.
This deliverable is number 5 of 5 in Work Package 5. The aim of work package 5 is to ensure that any mass scale retrofit mechanism designed by the consortium addresses the key needs of the end customer, the building occupant. seeks to conclude Work Package 5 with a summary of the previous deliverables, drawing out key items of learning, highlighting areas that impact wider project aims or ideas and providing a critical evaluation of the work package as a whole. The report contains:-
Publication Year:
2013
Publisher:
ETI
Author(s):
The Energy Zone Consortium
Energy Category
Language:
English
File Type:
application/pdf
File Size:
6752332 B
Rights:
Energy Technologies Institute Open Licence for Materials
Rights Overview:
The Energy Technologies Institute is making this document available to use under the Energy Technologies Institute Open Licence for Materials. Please refer to the Energy Technologies Institute website for the terms and conditions of this licence. The Information is licensed "as is" and the Energy Technologies Institute excludes all representations, warranties, obligations and liabilities in relation to the Information to the maximum extent permitted by law. The Energy Technologies Institute is not liable for any errors or omissions in the Information and shall not be liable for any loss, injury or damage of any kind caused by its use. This exclusion of liability includes, but is not limited to, any direct, indirect, special, incidental, consequential, punitive, or exemplary damages in each case such as loss of revenue, data, anticipated profits, and lost business. The Energy Technologies Institute does not guarantee the continued supply of the Information. Notwithstanding any statement to the contrary contained on the face of this document, the Energy Technologies Institute confirms that it has the right to publish this document.
Further information:
N/A
Region:
United Kingdom
Related Dataset(s):
No related datasets
Related Project(s):
Related Publications(s):
Building Supply Chain for Mass Refurbishment of Houses : Mass implementation - DfX Workshop Report
Building Supply Chain for Mass Refurbishment of Houses : Mass implementation plan (WP 3 D4)
Building Supply Chain for Mass Refurbishment of Houses: Customer Value - Defining the Customer