Abstract:
This report provides an overview of the Thermal Power with CCS – Generic Business Case Project, summarising the three major reports (Site Selection Report, Plant Performance and Capital Cost Estimating, and Plant Operating Cost Modelling). The purpose of this project was to compare the feasibility and costs of a single design of large gas fired power plant fitted with CCS, at a range of sizes (modules of 1x 600 MWe to 5x 600 MWe), in five separate UK regions. For each region an optimal site was selected to establish the costs and feasibility of the chosen plant design. A set of common values, limitations and selection criteria were applied in the site selection process including:
Publication Year:
2017
Publisher:
ETI
Author(s):
SNC-Lavalin UK Limited
Energy Category
Language:
English
File Type:
application/pdf
File Size:
1093901 B
Rights:
Energy Technologies Institute Open Licence for Materials
Rights Overview:
The Energy Technologies Institute is making this document available to use under the Energy Technologies Institute Open Licence for Materials. Please refer to the Energy Technologies Institute website for the terms and conditions of this licence. The Information is licensed "as is" and the Energy Technologies Institute excludes all representations, warranties, obligations and liabilities in relation to the Information to the maximum extent permitted by law. The Energy Technologies Institute is not liable for any errors or omissions in the Information and shall not be liable for any loss, injury or damage of any kind caused by its use. This exclusion of liability includes, but is not limited to, any direct, indirect, special, incidental, consequential, punitive, or exemplary damages in each case such as loss of revenue, data, anticipated profits, and lost business. The Energy Technologies Institute does not guarantee the continued supply of the Information. Notwithstanding any statement to the contrary contained on the face of this document, the Energy Technologies Institute confirms that it has the right to publish this document.
Further information:
N/A
Region:
United Kingdom
Related Dataset(s):
Thermal Power with CCS - CAPEX Spreadsheet - Teeside
Thermal Power with CCS - Frontier Investment Support Cost Tool
Thermal Power with CCS - Frontier Whole Electricity System Cost Tool
Related Project(s):
Related Publications(s):
Abated Gas Power - The Critical Contribution of CCS to the Future Power System
An ETI Perspective - An argument for CCS in the UK
Is CCS dead and if not how do we resuscitate it?
Thermal Power with CCS - A framework for assessing the value for money of electricity technologies
Thermal Power with CCS - D4.1 Plant Performance and Capital Cost Estimating
Thermal Power with CCS - D5.1 Plant Operating Cost Modelling
Thermal Power with CCS - Design Optimisations Technical Note
Thermal Power with CCS - Request for Proposals Thermal Power with CCS
Thermal Power with CCS - Technical Note: District Heat Networks