Reference Number NIA_NGN_432
Title MASiP- Digital Integrated Monitoring System
Status Completed
Energy Categories Fossil Fuels: Oil Gas and Coal (Oil and Gas, Refining, transport and storage of oil and gas) 100%;
Research Types Applied Research and Development 100%
Science and Technology Fields ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering) 100%
UKERC Cross Cutting Characterisation Not Cross-cutting 100%
Principal Investigator Project Contact
No email address given
Northern Gas Networks
Award Type Network Innovation Allowance
Funding Source Ofgem
Start Date 01 September 2023
End Date 31 December 2023
Duration ENA months
Total Grant Value £37,500
Industrial Sectors Energy
Region Yorkshire & Humberside
Programme Network Innovation Allowance
 
Investigators Principal Investigator Project Contact , Northern Gas Networks (100.000%)
  Industrial Collaborator Project Contact , Northern Gas Networks (0.000%)
Web Site https://smarter.energynetworks.org/projects/NIA_NGN_432
Objectives WP1: Review of information on two chosen use cases-Collate existing data on number, diameter, pressure rating, material and installation data of existing crossingsIntroduce high level potential benefits of MASiPEvaluate areas of key assumptions and/or missing data for case 1 crossingsEvaluate areas of key assumptions and/or missing data for case 2 hydrogenWP2: Questionnaire to identify quantum and potential value of first use cases-Draft questionnaire and help with the collection of detailed informationReview and amend as necessary based on WP1Issue for completionResponses developedCompleted Questionnaires returnedWP3: Feasibility review-Project risk matrix developed and updatedEngineering feasibility evaluation for use casesCommercial feasibility evaluation for use casesHSE feasibility evaluation for use casesRegulatory feasibility evaluation for use casesWP4: Cost Benefit definitionIdentify the key evaluation criteria for MASiP cost benefit against existing installationDevelop simple economic model for use categoriesEvaluate results with NGN input and iterate as requiredWP5: Feasibility study review with NGN-Technical and regulatory review for both categoriesCommercial review for both categoriesIdentification of key next stepsWP6: Project reporting-Project review meetingDevelop rolling reportPrepare final reportProject final report In Scope:Review of NGNs existing network and identify data issues in particular with regards to crossingsIdentification of the key challenges both short and long termHigh level feasibility assessment of MASIP in relation to GDNs challengesPreliminary cost benefit analysisOut of Scope:Detailed technical evaluation of MASIP installationDetailed cost estimationIntegration with NGN systems Assess the feasibility of implementing the MASiP pipeline system into the NGN network for the chosen used cases.Investigate the technical, operational, commercial, and safety aspects of deploying MASiP in high-priority crossings and new hydrogen pipelines.
Abstract The project seeks to investigate the deployment and use of MASiP (Mobile Automated Spiral Intelligent Pipe) in NGN"s network. MASiP is an integrated approach to digital integrity monitoring, automated mobile pipe manufacture and flexible pipe structure. The system allows for a better monitored network, increased network resilience and prepare the network for elevations in pressures, transporting of green fuels and gather data on high priority locations. The project will be a desktop study to identify the feasibility and viability of deploying such a system onto the network. Detailing the applications within high priority crossings and the creation of new hydrogen pipelines.
Data

No related datasets

Projects

No related projects

Publications

No related publications

Added to Database 02/10/24